Where the data comes from
LSA / FFA service must be done by approved stations, so the authorisation list is itself a critical data source — service performed at a non-authorised station is invalid and must be re-done.
What’s tracked
Each equipment item carries:
- Type and certification (SOLAS-approved, MED-marked, manufacturer)
- Last service date and service type
- Next service due date and type
- Service interval (typically annual + 5-year overhaul + 10-year hydrostatic)
- Service provider (approved station)
The three views
The LSA templates produce three complementary views:Equipment service history
Equipment service history
Every LSA/FFA item with last service date, next due date, and the service type. The list view a Chief Officer reads to plan the next service round.
Flag-specific requirements
Flag-specific requirements
Flag circulars often add requirements above SOLAS — e.g. extra CO₂-system testing intervals, additional EEBD mustering exercises. This view surfaces the flag-state-specific overlay so the schedule reflects what this vessel’s flag actually requires, not just the IMO baseline.
Service records and upcoming dates
Service records and upcoming dates
The dashboard view — what’s been serviced when, what’s coming up, what’s overdue. Plus the supporting documentation (service reports, certificates) for each completed service.
Service-window classification
Same expiry-window logic the other pipelines use:
LSA/FFA service windows are tighter than other expiry tracking because the service requires a shore-based approved station — you can’t service a lifeboat at sea. A service due within 14 days needs a port call within 14 days; if the schedule doesn’t allow it, the service slips and the equipment goes overdue.
Saturday routine
Saturday routines are the SOLAS-required weekly checks: lifeboat lighting, lifebuoy checks, fire-detection panel test, fire-pump start, etc. They aren’t part of the major-service schedule but they’re a leading indicator of LSA/FFA care. A vessel that consistently misses Saturday routines is a vessel where the smaller LSA/FFA items will start to drift. The pipeline tracks Saturday routine submission via the PMS pipeline and cross-references it with the major-service compliance.Flag-state overlay
Different flags impose different service intervals and additional checks. The flag-overlay view pulls the relevant flag circulars from the flag-circulars corpus and produces an overlay:- Panama: Marine Notice 13-2018 — additional CO₂ system release-mechanism testing
- Singapore: SCN 03 of 2023 — EEBD muster requirements during port stays > 24h
- Marshall Islands: MN-2-011-44 — life-raft maintenance station authorisation list
- Liberia: Marine Operations Note — semi-annual fire-pump performance verification
Maintenance station compliance
LSA/FFA service is typically done by approved stations — not every shore facility can certify a lifeboat or recharge a CO₂ cylinder. The pipeline tracks:- Station approval status (active, lapsed, conditional)
- Authorisation per flag (some stations approved by some flags)
- Service-quality history (any rework events)
Worked example
MV POSUN, Panama-flagged, end-of-April LSA/FFA review:
Plus the Panama overlay:
- CO₂ release-mechanism testing required quarterly under Marine Notice 13-2018; last done 2026-01-08, next due 2026-04-08 — overdue 22 days.
- Bridge EEBDs — service at next port (3 days). Until then, mark as out-of-service and use engine-room EEBDs for any bridge-area emergency.
- CO₂ release-mechanism testing — schedule with approved station at next port; this is flag-specific so a SOLAS-only inspection won’t catch it but a Panama flag inspector will.
- Fire-pump performance — book service for next port (within 11 days of due date).
- Flags the bridge EEBD overdue to the Master with the temporary mitigation note.
- Generates the next-port service work-list.
- Routes the flag-overlay finding to the Marine Superintendent with the specific Marine Notice citation.
What the senior review contains
- Equipment service status table — every item with last service, next due, verdict.
- Overdue list — focused view, severity-ranked.
- Flag overlay findings — items where flag-state requirements are more stringent than SOLAS.
- Saturday routine compliance — weekly check submission rate.
- Maintenance-station status — authorisation gaps, service-quality history.
- Next-port service plan — items due within port-call window, prioritised.
- Escalation decision — to whom, and why.
Escalation triggers
Why LSA/FFA needs its own pipeline
LSA/FFA tracking sits awkwardly across the other pipelines. PMS handles it generically but doesn’t know about flag-state overlays; certificates tracks SoC but not the underlying service. Defects sees the failures after the fact. None of the other pipelines fully reflect the urgency of safety equipment — a 14-day overdue lifeboat winch has different commercial consequence than a 14-day overdue paint-locker inventory. The dedicated pipeline keeps the visibility and the priority right.References
Templates: lsa-management
LSA-management suite — equipment service history, flag-specific requirements overlay, and service records with upcoming dates.
Related: PMS
LSA / FFA service items also live in PMS — the saturday-routine view is shared.
Related: Flag circulars
Flag-specific service overlay depends on a current flag-circulars corpus.
Related: Compliance
LSA / FFA findings appear in PSC and SIRE inspections — the compliance pipeline tracks those outcomes.